Section 106 Request for Review Level 1 Ecological Survey Asbestos Survey Categorical Exclusion Documentation Section 4(f) Determination of Applicability Section 404 Nationwide Permit Section 6(f) Coordination Package ASC Group conducted a series of Cultural Resources,...
Environmental PROJECTS
Environmental PROJECTS
SR 422 and Ramona Road Intersection Improvements Project, Lebanon County, Pennsylvania
NEPA Clearance Wetlands T&E Survey PHRS Forms Ag Resources Phase I Archaeological Survey The proposed project is the widening of the intersection to add turning lanes on SR east and westbound, the removal of the access to Main Avenue from SR 422 eastbound, the...
Wilmore Borough Flood Control Project, Cambria County, Pennsylvania
NEPA Clearance Geomorphological Survey Phase I Archaeological Survey The project consists of the proposed construction of a levee system to protect Wilmore Borough from flooding of the North Branch Little Conemaugh River and the Little Conemaugh River. The initial...
SCI-823 Portsmouth Bypass Project, Scioto County, Ohio
ASC was contracted by HDR Engineering, Inc. to update the ecological documentation for Construction Phase 1 of the Preferred Alternative of the Portsmouth Bypass Project (SCI-823-0.00) in Scioto County, Ohio (PID 19415). Due to the time elapsed from the initial ecological survey, the original surveys were outdated and in need of reevaluation.
In addition to the ecological reevaluation, ASC was contracted to update the existing Stream Mitigation Opportunities Inventory Report (SMOIR), update the existing threatened and endangered species surveys, and complete the waterway permits for the project.
HAM-Cleves Warsaw Rd. Bridge Replacement, Hamilton County, Ohio
ASC Group, Inc., under contract with Jacobs Engineering Group conducted cultural resources, ecological, and environmental surveys, and NEPA documentation for the HAM-Cleves Warsaw Road bridge replacement project in Hamilton County, Ohio.
The project included replacement of the 1923 Camelback through truss bridge over Muddy Creek. The new bridge is a three-span structure in place of the present one-span bridge and will require piers and new abutments.
I-70 Added Travel Lanes, Marion and Hancock Counties, Indiana
Under contract with Earthtech/AECOM, ASC Group Inc., completed cultural and environmental resources surveys for the I-70 Added Travel Lanes project in portions of Marion and Hancock counties, Indiana. Cultural resources surveys within the project areas included records checks, visual inspection, photography, shovel probes, and soil cores.
One archaeological site was recorded. It is recommended not eligible for the National Register of Historic Places (NRHP) and no additional archaeological work was recommended.
Veirs Mill Road Rapid Transit Study, Montgomery County, Maryland
The Veirs Mill Road study area is located in the northern portion of the Washington, D.C. metropolitan area, in Montgomery County, Maryland between Rockville and Wheaton-Glenmont. The study area is located in the south-central portion of Montgomery County. The entire Study Area is designated as a Priority Funding Area which directs Maryland State expenditures on economic growth and development.
Land use within the project area is predominantly medium-density residential with some commercial areas. The study area boundary comprises the area where potential exists for direct and indirect physical or operational changes associated with the project.
Crum Creek Viaduct, Delaware County, Pennsylvania
The project consists of the proposed replacement of the Crum Creek Viaduct over Crum Creek in Swarthmore Borough and Nether Providence Township, Delaware County. The existing viaduct is approximately 900 feet long, with seventeen spans, approximately 100 feet high, and was constructed in ca. 1897.
It is currently used by SEPTA’s Media/Elwyn Line commuter railroad line. Because of the length and height of the viaduct and the fact that it carries an active rail line, the proposed project will involve extensive preparation time and will necessitate several access points and staging areas for large materials and equipment.