ASC was contracted by HDR Engineering, Inc. to update the ecological documentation for Construction Phase 1 of the Preferred Alternative of the Portsmouth Bypass Project (SCI-823-0.00) in Scioto County, Ohio (PID 19415). Due to the time elapsed from the initial ecological survey, the original surveys were outdated and in need of reevaluation.
In addition to the ecological reevaluation, ASC was contracted to update the existing Stream Mitigation Opportunities Inventory Report (SMOIR), update the existing threatened and endangered species surveys, and complete the waterway permits for the project.